You are in the CarrTracks website Picture Gallery.

|
Engines 3383 and 2408 lead train NPSET into Argo Yard on September 1, 1987. The head brakeman aligns switches to bring the train in on the right track. Off in the distance you can see train SENP2. Disk 7 |
