You are in the CarrTracks website Picture Gallery.

BN train 112 comes off the Columbia River Railroad Bridge with SP engines

BN freight train at Vancouver, WA

Another westbound train waits on the former Spokane, Portland, and Seattle trackage for a signal to enter the yard in Vancouver.

BN train 112 comes off the Columbia River Railroad Bridge with SP engines

Train 112 pulls across the bridge from Portland with SP engine 9211 in the lead on August 25, 1987. This run-thru train began as train LAS and became train 112 in 1985. It handled priority traffic from SP train EUBNM for Tacoma, Kent, and Seattle. Disk 9