SP train symbol LADAF switching in Miller Yard

You are in the CarrTracks website Picture Gallery.

SP train symbol LADAF switching in Miller Yard

With the arrival of train LADAF in Miller Yard the first order of business is to get the piggyback traffic cut off from the rest of the train. Engines 4823, 4818, 4803, and 4805 are shoving the piggyback flats into the designated track. Disk 97 above 98 below

Switching train LADAF in Miller Yard Switching SP train symbol LADAF in Miller Yard

After shoving the piggyback flats in the clear, the engines are cut off and prepare to head to the south end of the yard to pick up another train. The switch engine in the distance will soon begin moving blocks of those piggyback flats to the ramp north of the yard for unloading.