TP&W engineer and conductor picking up train orders at Effner

You are in the CarrTracks website Picture Gallery.

TP&W engineer picks up train orders at Effner

Doing close to the speed limit of 40mph, the engineer on Extra 2008 East reaches out to pick up his set of train orders at Effner on August 12, 1982.

TP&W conductor grabs train orders at Effner

Riding the rear steps on caboose 726, the conductor grabs his set of train orders. Disk 112