Rio Grande Railroad freight train 197 at the Moffat Tunnel

You are at: CarrTracks > Gallery > Tunnel Pictures

Rio Grande Railroad freight train 197 at the Moffat Tunnel

Rio Grande freight train 197 (Extra 5339 West) is about to enter the east portal of Moffat Tunnel on June 6, 1978. Construction of the 6.2 mile long Moffat Tunnel began in 1924 and was completed in 1928. Disk 36

Tunnel Index

Western Pacific train WPX