You are at: CarrTracks > Gallery > Southern Pacific Cascade Route

|
The Pacific Coast Expediter (Extra 9021 East) rolls by the old depot at Minnow (milepost 601) on May 11, 1973 at 3:05PM. Construction of Lookout Point Reservoir in 1952 forced SP to relocate 25 miles of the Cascade Line south of the original alignment. |
