You are at: CarrTracks > Gallery > Southern Pacific Cascade Route

|
The second section of train RVEUM was coming into Dunsmuir with one load and 125 empties at 4,253 tons on June 13, 1987. The train has engines 9237, 7326, and 7329. Engine 7509 was resting between assignments. |