Seaboard Coast Line eastbound train at Monroe, NC in March 1981

You are in the CarrTracks website Picture Gallery.

The Georgia, Carolina & Northern Railroad started at Monroe in 1887 and built to Atlanta. It reached Chester, SC in 1888 and reached Atlanta in 1892. It was merged into the Seaboard Air Line Railway in 1901. SAL ordered automatic block signals for Monroe to Atlanta 269 miles in 1944. This project was completed by the end of 1945.

Seaboard Coast Line eastbound train at Monroe, NC in March 1981

An eastbound train comes into Monroe from Abbeville late in the afternoon of January 2, 1981. The train has engines 8059, 1030, 8047, and L&N 1067.

Seaboard Coast Line eastbound train at Monroe, NC in March 1981

Extra 7019 East rolls into Monroe with a train loaded with welded rail on March 28, 1981. The engineer reaches out to grab a set of train orders. Disk 129