You are in the CarrTracks website Picture Gallery.

BN Railroad Train 120 crossing Clark Fork River bridge

BN Railroad Train 120 crossing Clark Fork River bridge BN train 120 crossing Clark Fork River bridge

Train 120 is crossing the Clark Fork River. The NP completed this segment of the River Line in 1907. The line is 30 miles longer than the line over Evaro Hill but doesn't have the two percent grades, thus it became the preferred route for freight trains. Disk 11

BN train 120 by semaphore signal after crossing Clark Fork River