You are in the CarrTracks website Picture Gallery.

|
Lite power drops down the hill after helping a train up to Summit on May 31, 1978. Tunnel 3 was originally 707 feet long and was shortened to 494 feet after reconstruction following the 1952 earthquake. There is still a little green grass on the hillside. Disk 42 |
