You are at: CarrTracks > Gallery > Sand Patch Grade

|
After helping a train up to Sand Patch, a three unit helper set is running lite back to Hyndman. I am on the second unit and we are about to enter Falls Cut Tunnel. The tunnel was cut through the mountain in 1897 and is 517 feet long. One of the problems of taking pictures on a locomotive is the reflections from the glass. |